Thursday, March 12, 2015

Sewer Pipe Located

The weather was nice enough after work today that I could take a couple hours to locate and dig up the sewer line. I was relieved to find a good long piece of 4" (100mm) PVC that I could easily tie into. I was really hoping that would be the case since the clay pipe is much more difficult to work with. I would have probably been forced to hire a plumber to get it done right.



I also started working on digging the hole for the vertical sump pit, but after only a little bit I found the ground was still frozen. I'm guessing that layer is not very thick so we should be able to get through it over the weekend.

In the meantime, I'm ordering up some supplies that will be needed later on.