Thursday, December 3, 2015

Pre-Filter material arrived

I received a large roll of Pre-Filter media from UPS yesterday and got it installed over my filters.
I also got the bathroom door hung and sealed with a clear coat of Poly. The wood grain was too nice to paint over.

This weekend, the kids are having a Christmas party in the shop with some of their friends. The timing worked out perfectly as the lumber for the strong backs, frames, work tables and fabric racks will be arriving next Wednesday.

I'll also be placing the Core-Cell foam order soon. It seems there is quite the demand for SAN foam materials, so it can take 5-8 weeks for an order to be filled. If that's the case, then the timing "should" work out really well.

Bathroom door hung and clear coated. I still need to build out a loft storage area for foam storage.

Still need to install the doorknob and some trim pieces

Filter box is now completed. Pre-filter media is installed


This exhaust hole will be used later on to attach a flexible hose to force some clean air into the hull for ventilation.

Shop - pretty much ready to start the building project.

Once the strong backs get built, it'll be a long time before we see this view again!