What a relief to drive that last screw in, sweep off the roof and make the final checks before coming down and taking a shower!
I still have trim, rake, gutters and downspouts to do, but that can wait for the weekend.
My main concern was getting it to a point where I was no longer worried about the constant threat of rain. Soggy insulation is not anything you want to mess around with...
Anyway, some pics from the last two days:
Looking up at the vapor barrier before insulation is laid on top |
Insulation in place on first bay |
Second bay done |
Middle bay almost done |
Middle bay completed |
First layer of (R-19) insulation |
First layer of (R-19) insulation |
Second layer of (R-11) insulation |
Ready for sheeting on the final bay |
All three bays are now roofed! The open areas of vapor barrier will be sealed up later. |
Just one more panel! |
And now it can rain... :) |