After work yesterday, my son and I started going through the materials to segregate and inventory the various beams, parts, clips, bolts & etc.
We started layout of the South wall (the wall with the 12'x12' garage door) and struggled for a couple hours to figure out the instructions. We found one of the long rafter pieces was drilled incorrectly and will need to be re-drilled to make it correct.
Some joints were disassembled and reassembled a couple times to get the correct clips in place.
I think we have it figured out now and should be able to finish bolting the rest of the frames together this evening.
|
Sidewall height |
|
Laying out the pieces - trying to get all the holes matched up and labeled |
|
Working on getting the South wall laid out and bolted together |
|
It took a while, but we finally figured out that the circles on the drawings referred to another section of the manual that showed clip installation details |
|
South wall finished and half of the next wall completed |