Some electrical work and a lot of organization

I spent two whole days sifting and sorting through my tools and working on running some electric for outlets. I also got the shelf installed for the Hydronic heater and the plumbing roughed in for the sink.

I need to pick up some paint to take care of the walls before installing the heater.
Plumbing cold line and sink drain installed.
After this shot was take I added some additional R-19 insulation from the pile of leftovers
before installing the plywood walls.

It was a bit dark in the building so I adjusted the camera to lighten the image.
Not too good, but you can see the Hydronic heater in it's future place.