I need to pick up some paint to take care of the walls before installing the heater.
Plumbing cold line and sink drain installed. After this shot was take I added some additional R-19 insulation from the pile of leftovers before installing the plywood walls. |
It was a bit dark in the building so I adjusted the camera to lighten the image. Not too good, but you can see the Hydronic heater in it's future place. |
Corner bath and sink |