Tuesday, October 13, 2015

Working on the bathroom - Main door is scheduled

A few shots of the bathroom framing in the South East corner.
It's really small, just enough room for a urinal and access to the power panel. I wanted to get this wall done last night so I could get the power panel installed and wired in.

That went well, no problems except for the time spent walking back and forth to the garage to pick up different tools as needed. Speaking of which, the main door should be arriving tomorrow afternoon at the Overhead door shop and is scheduled for installation this Thursday morning!

And finally, the insulated HVAC ducting pieces for the Supply and Return are supposed to be ready for pickup later today.

Raw corner


Small bathroom will have just a urinal

Reusing lumber from the slab framing to build out the bathroom

Power panel installed. Hydronic lines (red) will be attached to a water heater and pump for slab warming

No comments: